Stony Point Caravan Park
The system installed manages all the wastewater from the caravan park. 2 x new 5000 Litre Concrete tanks plus 2 retrofitted to 2 existing 3600 Litre concrete septic tanks.
National Head Office
The system installed manages all the wastewater from the caravan park. 2 x new 5000 Litre Concrete tanks plus 2 retrofitted to 2 existing 3600 Litre concrete septic tanks.